Search
Close this search box.

2 Pipe vs 4 Pipe System fan coil unit

Divide the fan into two pipes, three pipes, and four pipes according to the quantity of water system layout, which refers to the form of the water system in each building.

Two fan coil unit :

the whole building water system adopts a water inlet pipe and a water outlet pipe. This system is supplied with cold water in summer and hot water in winter. Such a system can bring warmth to the whole area in cold winter and coolness in hot summer.

Two-pipe fan coil unit
Two-pipe fan coil unit

Four control fan coil unit :

Two surface coolers are present inside the fan coil, and each group of surface coolers connects to a water inlet pipe and a water outlet pipe.
From the appearance, we can see that the fan coil has two inlet pipes and two outlet pipes. Mostly, hospitals, hotels, and other places with high environmental requirements use fan coil units with this structure.
Four-control fan coil units can adjust the indoor temperature at will and can send out cold air to reduce the indoor temperature or hot air to increase the indoor temperature according to the needs of indoor personnel.

Comparison of two-control fan coils and four-control fan coils:

Two-control fan coil units have simple operation and management, convenient construction, and reduced construction costs. However, they do not allow switching between cooling and heating modes. Only cold air or hot air can be provided.
Four-control fan coil units have complex operation and management, complicated construction, and high construction costs.

However, indoor users have more choices, and they can arbitrarily switch the hot and cold modes to adjust and change the indoor temperature environment according to their individual needs.

4 pipe fan coil system schematic
4 pipe fan coil system schematic

What environment is suitable for two controls? What building environment is suitable for four controls?

Adopt two control water systems when the air-conditioning system running throughout the year only requires the conversion of cooling and heating according to the season.
High-rise buildings, especially high-rise shopping malls, amusement parks, and cinemas, are large-scale construction sites with relatively dense personnel. Using two control systems can meet most indoor temperature regulation requirements. Multi-story or high-rise civil buildings widely use the air-conditioning water system.

During the whole year’s operation, use an air-conditioning system with a four-pipe water system when the cooling and heating conditions frequently alternate or need to be used simultaneously. The four-control fan coil unit suits the situation where the standard of the construction site is high and the budget meets the requirements.

Facebook
Twitter
LinkedIn

Leave a Reply

Your email address will not be published. Required fields are marked *

Yesncer Fan Coil Unit Manufacturer

Search

Sign up to our newsletter

Please enter your email to let us contact you

We will contact you within 1 working day, please pay attention to the email with the suffix “@aircolder.com”

Welcome Back

Everything is where you left it.
Receive the latest news

You seem to like our article.

Get notified about new articles

You seem to like our product content very much.

Give us your contact information and we will send you more detailed product data and provide professional project solutions.

Which product are you interested in?

Fill out the form below to tell us what products and information you are interested in, or tell us about your project.

We will reply within 24 hours.

Registration

To reserve your ticket please fill out the registration form